Vehicle bridge and connecting infrastructure between Zambia and the DRC
In the framework of the project, we prepared detailed and construction plans of infrastructural developments in the Democratic Republic of Congo (DRC) and Zambia.
The contract is based on the PPP concession contract to build and maintain the main road Kasomano – Kasenga – Chalwe (CGO) – Kabila – Kashiba – (M35) – Mwenda (Z). Contract included a 86 + 95.6 km long main road and a 362 m long border crossing bridge above River Luapula in the DRC and Zambia.
Contractor: Duna Aszfalt Zrt., GED Africa
Parameters
Material
Steel
Function
2x1 lane vehicle bridge
Length of designed national road
184 km
Length of designed bridge
362 m
Luapula River, DRC, Zambia
Location
Est. 2027
Year
Under construction
Status
services
PPP Project, contribution from the very early phases, design and consultancy, road & infrastructure design, bridge & structural design, utility & drainage design, geotechnical analysis